004 The Demolition Begins

These shelves needed to be moved from the North Wall. They are pine, attatched directly onto the wall with screws and nails. They weren't sturdy, and came down completely in about an hour (the timestamps on the photos state 1:40 from moving the scaffolding to sweeping the floors)

Check out the Flickr set of the demolition

0 Responses to “004 The Demolition Begins”

Post a Comment